Case Studies

Large Regional Banking Client Refresh Environment with Power8

Banking operations clearly need constant availability – and if your regions include the Middle East and all of Europe, there is no weekend downtime.

Having provided the Bank with a resilient POWER7 AIX environment in 2014, Covenco was delighted to be asked to refresh the environment in 2017 with a larger POWER8 platform.

The final solution comprised of 4 x Production systems in a multiple POWER HA configuration, with an SSD ‘heavy’ V7000 providing the powerful disk solution.

The final design utilizes Flash Copy to provide multiple points of rollback, and SKLM to encrypt the backups for GDPR/Security reasons.

Disaster Recovery Technician

Request more information

Please complete this form to learn more about our Power Systems experience and capabilities.